HUON PINE MOTOR SAILER in ALBION HEIGHTS, Tasmania for sale
DESIGNER/BUILDER - Les Cartledge and Cecil Cartledge
LOH - 25ft 7 "
BEAM - 9 ft 6'
DRAFT- 3ft
DISPLACEMENT- 4 tonnes (approx)
HULL MATERIAL - Huon Pine, carvel planked
DECK - Celery Top Pine
ENGINE - Beta 28hp diesel with new (2010) engine bed, engine mounts and accessories. Hydraulic wheel steering from cockpit.
ENGINE HOURS - about 100
ENGINE ROOM - under companionway steps with excellent access
FUEL - 160 litres in stainless steel tank
WATER - 2 x 60 litre aluminium fresh water tanks
ACCOMMODATION - Near new upholstery and carpet throughout in perfect condition
4 single berths with storage under
TOILET - TMC electric toilet in an enclosed forepeak
GALLE Y- Stainless steel sink wth pressure cold water pump, 2 burner metho stove on sliding retractable bracket
REFRIDGERATION - Ice box under quarterberth to starboard.
COVERS - Boom bag and covers for deck hatches and steering wheel
GROUND TACKLE - Muir V85 electric anchor winch with controls to helm. CQR anchor 50 metres of 8ml galvanised chain
SAFETY GEAR - Manual Bilge pump, 2 horseshoe lifebouys, Fire Extinguisher, Horn EPIRB, 2 x PFD 1 Life Jacket, Flares, Safety grab bag
ELECTRICS - New (2010) electrical system, wiring, batteries, switchboard, water pressure pump, light fittings etc. As new electric auto/manual 2000gph Bilge Pump. 2 x12 volt batteries and Battery charger
ELECTRONICS/NAVIGATION - Navman 5505 Chart Plotter, Navman 3100 series wind speed, Depth Sounder and Log instruments, GME CD/stereo, GME VHFand 27 meg Radios
SAILS - Offshore fully battened Mainsail and Offshore Tri radial cut Genoa with Luff foam
Mast/Rigging - Barlow 25 self-tailing winches, Furlex 600S Self Furler, stainless steel Rigging with Mainsheet traveller above main cabin
DECK GEAR - Stainless steel and timber Swim Platform, stainless steel Deck Fittings, 2 x Aluminium Deck Hatches, Cockpit Cushions and Boathook and Fenders
This beautifully presented vessel was launched in 1983, and has undertaken a 5 year refit from 2005 - 2010, which included a new engine, all new electrics, exhaust system,prop shaft, hydraulic steering, dripless stern gland and much more.
A full survey was conducted in January 2013 and is also available for perusal.
Please note - SMS messages will not be replied to
The quality of this vessel is obvious and a pleasure to inspect..Not a cent to spend and ready to go!